District Stewardship Report
DISTRICT INFO
BILLING AND MAINTENANCE
Astbury Water Technology is the District’s Operation, Billing and Maintenance contractor.
SEWER DISTRICT
- Located 0.5 miles South of the Town of North Webster IN & 5.0 miles North East of Warsaw IN.
- District Area is about 3,700 acres and includes 8 lakes.
- Service Area is about 2,500 acres
- To see District borders click here.
- The District services 1,649 properties / Including
- Apartments – 8 ea.
- Mobile Home Courts – 10 ea.
- Duplexes – 3 ea.
- Single unit w/ Detached guesthouse – 8 ea.
- Cabins – 10 ea.
- Hotels – 1 ea.
- Restaurants / Bar – 3 ea.
- Campgrounds – 2 ea.
- Marinas – 2 ea.
- Church – 1 ea.
- Note: No Industry properties
COLLECTION SYSTEM
- Design as a low pressure system.
- Grinder Pump station Type I – 813 ea.
- Grinder Pump Station Type II – 423 ea.
- Grinder Pump Station Type III – 21 ea.
- Grinder Pump Station Type IV – 8 ea.
- Force Main HDPE – lineal feet
- 2” – 103,680 lf.
- 3” – 14,318 lf.
- 4” – 5,397 lf.
- 6” – 21,060 lf.
- 8” – 9,492 lf.
- 10” – 3,620 lf.
- Off Site Force Main – 17,560 lf.
- Isolation Valve – 162 ea.
- Off Site Isolation Valves – 5 ea.
- Air Release Valves – 58 ea.
- Service Laterals – 1,251 ea.
- Main Lift Stations – 3ea.
- Chemical Feed Buildings – 3 ea.
- Lift Sta. Back Up Generator – 3 ea.
WASTEWATER PLANT
- Wastewater Permit issued October 1, 2013, with renewal every five years
- Permitted Capacity – 0.4 MGD
- Extended Aeration Facility Class II
- Discharge Van Curen Dich – Elevation 873.00
- Property Size 10.15 AC
- Administration, Lab. & Shop Building – 4,365 sq. ft.
- Sludge & Dewatering Building – 1,600 sq. ft.
- Equalization Tank – 419,947 gal. US
- Plant Processing Tanks – 816 sq. ft.
- Aeration Mixer 2.7 HP – 1 ea.
- Polymer Pump – 1ea.
- Blower Building – 383 sq. ft.
- Blowers 75 HP. – 4 ea.
- Bar Screen 6mm. – 1 ea.
- UV Disinfectant System – 1ea.
- Plant Back Up Generator – 1 ea.
- Chemical Feed Building – 2 ea.