District Stewardship Report

 

BILLING AND MAINTENANCE

Astbury Water Technology is the District’s Operation, Billing and Maintenance contractor. 

 

SEWER DISTRICT 

  • Located 0.5 miles South of the Town of North Webster IN & 5.0 miles North East of Warsaw IN.
  • District Area is about 3,700 acres and includes 8 lakes.
  • Service Area is about 2,500 acres
  • To see District borders click here
  • The District services 1,649 properties / Including
    • Apartments – 8 ea.
    • Mobile Home Courts – 10 ea.
    • Duplexes – 3 ea.
    • Single unit w/ Detached guesthouse – 8 ea.
    • Cabins – 10 ea.
    • Hotels – 1 ea.
    • Restaurants / Bar – 3 ea.
    • Campgrounds – 2 ea.
    • Marinas – 2 ea.
    • Church – 1 ea.
  • Note: No Industry properties

 

 

COLLECTION SYSTEM

  • Design as a low pressure system.
  • Grinder Pump station Type I – 813 ea.
  • Grinder Pump Station Type II – 423 ea.
  • Grinder Pump Station Type III – 21 ea.
  • Grinder Pump Station Type IV – 8 ea.
  • Force Main HDPE – lineal feet
    • 2” – 103,680 lf.
    • 3” – 14,318 lf.
    • 4” – 5,397 lf.
    • 6” – 21,060 lf.
    • 8” – 9,492 lf.
    • 10” – 3,620 lf.
  • Off Site Force Main – 17,560 lf.
  • Isolation Valve – 162 ea.
  • Off Site Isolation Valves – 5 ea.
  • Air Release Valves – 58 ea.
  • Service Laterals – 1,251 ea.
  • Main Lift Stations – 3ea.
  • Chemical Feed Buildings – 3 ea.
  • Lift Sta. Back Up Generator – 3 ea.

 

 

WASTEWATER PLANT

  • Wastewater Permit issued October 1, 2013, with renewal every five years
  • Permitted Capacity – 0.4 MGD
  • Extended Aeration Facility Class II
  • Discharge Van Curen Dich – Elevation 873.00
  • Property Size 10.15 AC
  • Administration, Lab. & Shop Building – 4,365 sq. ft.
  • Sludge & Dewatering Building – 1,600 sq. ft.
  • Equalization Tank – 419,947 gal. US
  • Plant Processing Tanks – 816 sq. ft.
  • Aeration Mixer 2.7 HP – 1 ea.
  • Polymer Pump – 1ea.
  • Blower Building – 383 sq. ft.
  • Blowers 75 HP. – 4 ea.
  • Bar Screen 6mm. – 1 ea.
  • UV Disinfectant System – 1ea.
  • Plant Back Up Generator – 1 ea.
  • Chemical Feed Building – 2 ea.